
electrical system
Battery to Lynx, Lynx to Inverter, chassis ground, Lynx to Inverter ground.
Load center to inverter.
Ground bus inside 120v load center.
Need 2.
For the Lynx Distributor.
In Lynx on 12v fuse panel and DC/DC charger terminals.
In Lynx on MPPT terminal.
One in Lynx on inverter terminals.
Car battery to DC/DC, DC/DC to Lynx, 12v fuse panel to Lynx.
MPPT ground
MPPT to Lynx
From Cerbo to battery.
From Cerbo to inverter.
From Cerbo to MPPT.
Between solar and MPPT on positive.
Between DC/DC charger and Lynx on positive.
One on each solar panel on positive.
Mount MPPT to for heat distribution.
Mount DC/DC charger to for heat distribution.